fbpx

Address: st. Branilaca grada b.b., 75 320 Gračanica, BIH

ŠIRBEGOVIĆ CONTINUES TO BUILD IN CROATIA

Contracting of new projects and cooperation with old customers is proof that the company Širbegović perform well and respects the needs of its customers.

After the first in BiH meet European standards and received certificates of conformity factory production control Širbegović company continues to do business on the Croatian territory.

Sirbegovic successfully completed the installation of reinforced concrete structures to house the factory for the production of energy bars in the town of Nova Gradiska. The building has a total area of 7000 m2. Investor Atlantic Multipower Ltd. is very pleased with the quality and performance of the facility.

Otherwise, the installation of reinforced concrete structure was completed seven days ahead of schedule, with respect to all other contractual obligations.

All design elements are manufactured in the facilities of Širbegović in Gracanica, the detailed drawings and static calculations, in accordance with the applicable laws and the relevant standards.

We are very proud of the fact that the constantly shifting the scale “up” and that each project provides a solution “tailored” observing primarily the safety of people and the environment, with the least possible cost and maximum profit for our customers.