Company ŠIRBEGOVIĆ recognized the importance of the conference “Current Status and Further Development of Eurocodes in the Western Balkans Region”
The conference “The Current Status and Further Development of the Eurocodes in the Western Balkans Region” was held on 29…
Installation of AB prefabricated construction at the facility in Novigrad, Croatia is in progress
At the location of Donja Klezna-Ulcinj, assembly of prefabricated reinforced concrete bridge beam is in progress.
At the location of Donja Klezna-Ulcinj, assembly of prefabricated reinforced concrete bridge beam is in progress. This type of carrier…
Assembly of AB construction at the warehouse facility “Bartog” are completed
Works on AB construction assembly at the warehouse facility “Bartog”, Mirna Peč in Slovenia are completed. Object area : 12.500…
Design and execution of contracted works at the new production plant of the company Variplast from Gracanica has been completed
Širebgović Engineering has completed design and execution of contracted works at the new production plant of the company Variplast from…
We are delighted to invite you to visit our booth at the 44 INTERNATIONAL BUILDING TRADE FAIR 2018
We are delighted to invite you to visit our booth at the 44 INTERNATIONAL BUILDING TRADE FAIR from 18th to…
Širbegović : Works on the terminal Luka Gaženica are in progress.
At the location of Bijela near Brčko, works on the construction of prefabricated bridge ranged from 30 meters, weighing approximately 40 tons and with the quality C55
At the location Bijela near Brcko, works has been completed on the construction of prefabricated bridge , the range of…
Širbegović – in 2017, revenue growth is 36% compared to the previous year
Business results in 2017 bring us optimism, because besides growth of revenues of over 36%, we have made improvements in…
VOLI TRADE, Podgorica
The montage of the VOLI TRADE d.o.o. Podgorica, Montenegro has been finished. The surface of the building is 13.270 m2….