At the location of Bijela near Brčko, works on the construction of prefabricated bridge ranged from 30 meters, weighing approximately 40 tons and with the quality C55
At the location Bijela near Brcko, works has been completed on the construction of prefabricated bridge , the range of 30 meters, weighing approximately 40 tons and with the quality class C55 / 67 (MB70).
This type of carrier satisfies the requirements prescribed for bridges in terms of loads, durability of construction and modern construction technology.
With the same technology, we negotiated the construction of a bridge in Montenegro in Ulcinj with a construction deadline of 60 days.
We believe that investors and designers in the coming period will recognize the advantage of this technology in applying these solutions to the design of integral bridges